Saturday, 8 March 2014

Hardware Deployment Plan For Court Complexes


eCourts MMP
HARDWARE DEPLOYMENT PLAN AT A COURT COMPLEX
January 2010
Items
Location
Thin Clients # 1 and 2
2 nos. in each Court Room ( 1 for typist, 1 for record keeper)
Thin Client # 3
1 no. at each JSC counter (Maximum 5 NOs.) remaining thin clients could be installed at Copying, Admin and other sections based on local requirements.
Thin Client # 4
1 no. in Server room, to be used as monitor of Server provided for court complexes where court room are more than 1 in Court Complex
Slim Client # 1
1 no. in each Court Rooms for Stenographer/Person who types the judgment
Slim Client # 2
Provided only Single court complex where server has not been provided, 1 Nos. Slim Client which is to act as Server.
Laptop
Judges Chamber
Dot Matrix Printers
1 no. at each JSC counter (Maximum 5 NOs.) remaining DMP could be installed at Copying, Admin and other sections based on local requirements.
1U /2U Server
Server Room
Switch - 8 ports/24 Ports*
Court Room/Server room
Router
Server Room
Modems
Server Room
500 VA UPS
1 per Court Room; to be used for slim clients / desktops and switches.
1KVA / 2KVA UPS
Server Room (for servers and other equipment installed in server )
Pen drives
1 per each thin client
250GB HDD
Server room for backup purpose
Scanner
JSC (Judicial Service Centre)/Server room
Rack, KVM SWITCH(4/8 Port), 7 feet patch chords and related accessories
Server room (to be used for installing server except single court complex)
5KVA UPS (if Proposed, based on no. of Courts in a Complex)
For Servers. To be installed Adjacent or nearby convenient place to the Server Room in the Court Complex
Mono Laser Printer Tonners
To be decided by Court Incharge
Linux Server Distribution Media
Server Room /To be decided by Court Incharge
Portable Projector (provided to District/Principle Court of each District )
Server Room /To be decided by Court Incharge
Mono Laser Printer#1
1 in each Court Room to be used with Slim Client
Mono Laser Printer#2
Already provided with Laptop. To be used in the court room.


* - All the network switches (8/24 Ports) to be installed either in the Server Room and to be given power backup through 1KVA 2 KVA/ 5 KVA UPS OR to be installed inside/nearby Court Rooms and to be given power back up through 500 VA UPS provided with each Slim Client.                                                                